P009OWNER’S MANUALP-DRC1YIT IS MANDATORY TO HAVE A WALL STUD ON EACH SIDE OF THE SHOWER UNIT TO SECURELY FASTEN THE RAIL TO THE WALLS.06.
103 FIXED PANEL AND RETENTION GASKET Fasten the running rail (1) to the xedpanel (7) with the glass holders (4).Secure them temporarily in place.
114 FIXED PANEL PLACEMENT1ENSURE THAT THE FIXED PANEL AS WELL AS THERUNNING RAIL ARE LEVEL DURING THESE PROCEDURES. Begin by removing the bottom g
125 CONTINUED Remove the xed panel assembly (7) andcarefully lean it to the side, ensure that it is placed on a protective surface. Moreover, ensure
13CONTINUED8A8B7TOP ROLLERS INSTALLATION Reposition the xed panel assembly in place, ensuring that the xed panel (7) nests within the bottom glass
14DOOR PANEL PLACEMENT Install the set of double rollers (5) to the bottom holes of the door panel (6), making sure that they are tangent to the runn
1510 STRAIGHT HANDLE GASKETS INSTALLATION 11 Install straight handle (8) onto sliding door (6). Ensure that clear washers on either side of glass a
16 STOPPERS ADJUSTMENT12Adjust the position of the stoppers (3) so as to ensure a maximum opening and closing range. Ensure that the sliding door gask
17SILICONE14THRESHOLD INSTALLATION13Apply silicone (S) between the bottom of the xed panel and the threshold of the base. This is done from th
18 DOOR PLACEMENT 1COMPONENTS INSTALLATION 2 Fasten the running rail (1) to the xedpanel (7) with the glass holders (4).Secure them temporarily i
193FIXED PANEL AND RETENTION GASKET Fasten the running rail (1) to the xedpanel (7) with the glass holders (4).Secure them temporarily in place. Thor
2PANNEAU FIXE/FIXED PANEL1CONFIGURATIONS AND PARTS LISTING ... 3,4,5,6PROVIDED HARDWARE ...
204 FIXED PANEL PLACEMENTENSURE THAT THE FIXED PANEL AS WELL AS THE RUNNING RAIL ARE LEVEL DURING THESE PROCEDURES. Begin by removing the bottom g
215 CONTINUED Remove the xed panel assembly (7) andcarefully lean it to the side, ensure that it is placed on a protective surface. Moreover, ensure
227CONTINUED6TOP ROLLERS INSTALLATION Reposition the xed panel assembly in place, ensuring that the xed panel (7) nests within the bottom glass cli
238DOOR PLACEMENT Install the set of double rollers (5) to the bottom holes of the door panel (6), making sure that they are tangent to the running ra
24 HANDLE INSTALLATIONGASKETS INSTALLATION 11 Fasten the running rail (1) to the xedpanel (7) with the glass holders (4).Secure them temporarily in
25STOPPERS ADJUSTMENT12Adjust the position of the stoppers (3) so as to ensure a maximum opening and closing range. Ensure that the sliding door gaske
26THRESHOLD INSTALLATION13COUPER SELON L’OUVERTUREAVEC UNE SCIE À MAINSILICONE14HOURSCut the threshold (13) to the necessary opening ensuring optimal
3 BILLLL OF MATERIALS1aABSL66-18L1234596781 01 11 2ITEMPARTSQTY1RUNNING RAIL Ø1.00" (25.4mm)12WALL BRACKET 23STOPPERS 24GLASS FASTENER25T
PANNEAU FIXE/FIXED PANEL4PANNEAU FIXE/FIXED PANEL123597681 01 11 24LR BILL OF MATERIALS1bABSL66-18LITEMPARTSQTY1RUNNING RAIL Ø1.00" (25.4mm)
5ABSL66-18R1234596781 01 11 2ITEMPARTSQTY1RUNNING RAIL Ø1.00" (25.4mm)12WALL BRACKET 23STOPPERS 24GLASS FASTENER25T WIN ROLLER2 6 SLIDING DOOR P
6ABSL66-18R1234596781 01 11 2ITEMPARTSQTY1RUNNING RAIL Ø1.00" (25.4mm)12WALL BRACKET 23STOPPERS 24GLASS FASTENER25T WIN ROLLER2 6 SLIDING DOOR PA
7OUTILS/TOOLSHARDWAREPENCILDRILL SILICONESCREWDRIVERSCUTTING PLIER LEVELTAPE MEASURE181920 If the shower panels are to be assembled on ceramic tiles,
81BEGIN THE INSTALLATION PROCEDURE AT PAGE 9.BEGIN THE INSTALLATION PREOCEDURE AT PAGE 9.CONSIDER THAT THE ILLUSTRATIONS ARE RELEVANT TO MODEL L
9 DOOR PLACEMENT 1 Position the glass fasteners (4), stoppers (3) and wall brackets (2) on the running rail (1) as illustrated. 2A Temporarily sec
Comments to this Manuals